Delivery
How BuildBarn delivery checks work
Understand what information helps a bulky or long-length order move through delivery checks cleanly.
Delivery check steps
- 1Prepare the material list
Keep product groups, long lengths and bulky items together so the order can be assessed as a full load.
- 2Add site access notes
Record driveway constraints, unloading preferences, gate access and any site timing requirements.
- 3Check pickup and delivery options
The team can then align the order with pickup, local delivery or a freight check pathway.
Access notes to collect
- Street access and driveway notes.
- Long-length handling constraints.
- Preferred staging or delivery timing.
- On-site contact instructions for the order.